Shanghai, China+86 137 0322 1400yuxuan@jinxiprecision.comgloria@jinxiprecision.com

Metal stamping

Stamping parts services

The viable stamping route depends on geometry, material strip, annual demand, tooling scope, burr direction and the controls needed to hold critical dimensions across production.

Stamping parts services product or production example

Processing scope

What this service can include

  • Blanking, piercing and forming review
  • Progressive or staged tooling assessment
  • Prototype-to-production route comparison
  • Burr, flatness and critical-dimension control planning

Buyer inputs

What to include in the RFQ

  1. Part drawing and functional interfaces
  2. Material grade, temper and thickness
  3. Prototype and annual volume
  4. Tool ownership, life and maintenance expectations
  5. Burr direction, flatness and inspection plan

Products & equipment

Sample evidence must connect to the process.

These retained images show product or equipment context available for review. Exact model, travel, force, envelope, quantity and availability will be added after the technical inventory is confirmed.

  • Evidence pointPress capacity selected after part/tool review
  • Evidence pointTooling, die and maintenance resources
  • Evidence pointIn-process gauges and sample inspection
  • Evidence pointPacking controls for thin or cosmetic parts

Technical data

Project limits must be verified before commitment.

Use these structured slots to understand what will be confirmed during technical review.

Awaiting verified detailEquipment model and working range

Model, travel, spindle or press force, supported envelope and current availability will replace this description.

This is a structured placeholder, not a production claim.
Awaiting verified detailMaterial and tolerance boundary

Material-grade coverage, thickness or size range and feature-specific tolerance conditions will replace this description.

This is a structured placeholder, not a production claim.
Awaiting verified detailLead time and quality evidence

Prototype timing, batch timing, inspection documents and traceability scope will replace this description.

This is a structured placeholder, not a production claim.

Manufacturing workflow

One controlled route from RFQ to shipment.

  1. 01 · Requirement reviewDrawing revision, material, quantity and critical requirements.
  2. 02 · DFM & process planManufacturing route, open questions, tooling and inspection checkpoints.
  3. 03 · Production & in-process controlApproved inputs, controlled setup and risk-based checks.
  4. 04 · Final verificationAgreed dimensions, documentation, finish, marking and packaging.

Service FAQ

Questions to resolve before commitment.

When does production tooling make sense?

Tooling economics depend on geometry, material, forecast volume, expected program life and the alternative machining or fabrication route.

What should be defined about burrs?

State allowable burr height, preferred burr direction, edge-break requirements and any functional or safety interfaces.

Content accountabilityPrepared by the Jinxi Precision content team. Named technical reviewer and review date will be displayed after capability data is approved.

Next step

Let the drawing determine the answer.

Send the latest files and commercial context so the process and inspection route can be reviewed together.

Prepare an RFQ