Plan initial batches and repeat CNC orders with Jinxi Precision in Shanghai. Share drawings, batch sizes, annual demand and inspection requirements so your production and delivery assumptions can be reviewed.
A successful first batch is only one part of a repeat-order purchasing decision. Buyers also need a clear drawing revision, agreed quality documents and a supply plan for later releases. From our Shanghai factory, Jinxi Precision reviews both initial CNC batches and ongoing production requirements for overseas customers.
Share your batch quantity and annual demand
Match the quantity to the manufacturing plan
Our project review range extends from dozens to hundreds of thousands of parts. It is not a blanket capacity or delivery guarantee. Geometry, material availability, tooling, inspection and the timing of releases determine what can be committed for your order.
- First batch: identify the current revision, purpose of the initial quantity, critical features and acceptance requirements.
- Repeat batch: confirm whether the drawing, material, finish, inspection or packaging requirements have changed.
- Annual program: distinguish a demand forecast from confirmed purchase quantities and state the expected release schedule.
Before moving from samples to production
Define what constitutes approval before the first batch starts. State which dimensions require reporting, which material records are needed and who will resolve open technical questions. First-article records and other inspection documents can be agreed where required; report format, sampling, traceability and any additional cost are defined during quotation.
Do not assume a sample approval automatically covers a later drawing revision or a changed process requirement. Flag changes in the repeat RFQ so engineering and purchasing can review their effect on price, inspection and timing.
Before a second supplier starts: resolve the handover gaps
A repeat part number does not tell a new supplier everything that made the previous delivery acceptable. Before treating a transfer as routine repeat production, check whether the released design, acceptance evidence and permission to use the supporting material are clear.
| What you have | What to resolve before release |
|---|---|
| A CAD model and drawing that do not match | Identify the controlling revision and resolve the difference. Do not let either supplier choose an unstated interpretation. |
| An approved sample from the previous source | Link the sample to the released revision and agreed acceptance criteria. Decide which checks the new source must complete before repeat releases are approved. |
| Tooling, fixtures or process notes used by the previous supplier | Confirm ownership and permission before transferring them. Describe the required part outcome; do not assume the same manufacturing route can simply be copied. |
| A new supplier making the part for the first time | Agree the initial-batch review and approval route. Approval of the previous source does not define approval of the new source. |
| A repeat schedule that leaves little room for transport or rework | Include the destination, release dates and required arrival date in the review. Confirm that the proposed supply route fits the actual schedule before committing. |
For the quotation inputs, use the RFQ checklist below. For the acceptance package, see our inspection and documentation guide.
Jinxi Precision reviews initial and repeat CNC requirements from Shanghai. Our Swiss automotive cooperation brief provides background on an ongoing relationship; a new supplier-transfer request still needs its own part and requirement review.
Request a second-source review: describe the current revision, intended application, initial quantity, repeat schedule and open handover questions on our RFQ page. If detailed files need an NDA or another agreed transfer route, start with the non-confidential scope.
Send a production-ready RFQ
- Part number and drawing revision, with 2D drawing and available 3D model.
- Material grade and condition; finish and protected surfaces.
- Initial quantity, expected repeat quantity and annual forecast.
- Critical features, acceptance criteria and required documentation.
- Delivery destination, release dates and packaging requirements.
- Any qualification, traceability, NDA or controlled-transfer requirements.
Compare total supply cost, not only unit price
Ask for the treatment of setup or tooling, recurring inspection, documentation, packaging and transport to be clear in each quotation. A quoted volume break only applies to the assumptions stated in that quotation. We do not advertise a universal price, fixed lead time or automatic discount for an unreviewed part.